This project, located in southern Alabama, consisted of replacing a number of 230kV structures and to correct line problems such as clearance violations, damaged insulators, broken guys, etc. The task at this particular structure was to replace damaged insulators. Because the structure was located in a designated wet land mats, nor powered equipment, were allowed. SEC’s crew climbed the structure and using a hook ladder and other specialized tools changed out the insulators bringing the structure into compliance.